
Following a recent survey, it was discovered that there was not enough cooling capacity in the SCR Room and especially during major drilling operations. We supplied and installed x3 twin circuit air conditioning systems which now provides plenty of redundancy with x6 circuits in total. Should one circuit trip out on fault then the other 5 circuits will still provide effective cooling at these times.